Delivery Modes ​

A project's delivery mode decides which infrastructure actually sends its email, and what limits apply while it does. Every project has one of three: sandbox, the default, which sends immediately through BlueFox-managed infrastructure under low daily caps; production, which lifts those caps after your domain is verified and your application is approved; and BYO AWS SES, which routes sending through your own Amazon SES account with no BlueFox review at all. The mode is set per project, so a staging project and a live project can sit in different modes at the same time.

You can find and change the delivery mode of a project in your project settings, under the Sending Setup section.

Sandbox Mode ​

Whenever you create a new project in BlueFox Email, it starts in sandbox mode.

A screenshot of the project delivery mode settings.

This mode is designed to help you get started quickly without needing to set up anything. You can send to any recipient right away, there's no verified-recipient requirement but there are a few limitations to be aware of:

  • These emails will be sent from no-reply@bluefoxemailsandbox.com by default. You can verify a domain to send from your own domain instead of the shared sandbox sender, while still remaining in sandbox mode.
  • You can send 100 emails per day.
  • Lower throughput (1 email/sec).

Sandbox mode is perfect for testing and development. It allows you to explore BlueFox Email's features without any initial setup.

Production Mode ​

When you're ready to send beyond sandbox mode's limits, you can request to move your project to production mode. This mode lifts sandbox mode's daily and throughput caps, letting you send at a much higher, approved volume.

To transition to production mode, you need to verify your domain (same place as sandbox mode) and request production access. For application instructions, click the button below here in your project settings.

Once the DNS records are in place, you can confirm they resolve with our free SPF checker, DKIM checker, DMARC checker, and MX checker. Those are the same four record types domain verification reads.

A screenshot of the project delivery mode settings with the request production access button highlighted.

When you request production access, you'll be asked:

  • Website: a link to learn more about your product or business. This is pre-filled with your verified sending domain, but you can change it.
  • Monthly sending volume: an estimate of how many emails you plan to send each month.
  • Why you're considering BlueFox Email: for example, issues with your current provider, looking for better deliverability, or it's your first email platform.
  • What type of emails you intend to send: transactional, triggered, marketing campaigns, newsletters, automations, onboarding or welcome emails, etc.
  • How you acquire your subscribers or contacts: application sign-ups, opt-in forms, lead generation services, or other sources.
  • What your product or service does: a brief description to help us review your request faster.

A screenshot of the project delivery mode settings with production mode selected.

Answer the questions honestly, and we will review your request as soon as possible.

Once your project is approved for production mode, you can confirm that with this badge here at the top of your project. Your project is also granted a monthly sending limit matching the volume you requested for example, requesting 10,000 emails/month gets you approved for 10,000/month.

A screenshot of the project delivery mode settings with production mode badge.

Here is what you can do in production mode:

  • Send emails to any address, no verified-recipient requirement.
  • Send up to the monthly limit approved for your project.
  • Higher throughput
  • Use your own domain.
  • Add identities (emails) directly in your project settings. Make sure that the domain of these emails is verified.

If you need to send more, return to the same production access page in your project settings to request a limit increase.

Managing Identities in Production Mode ​

In production mode, you can manage your sender identities directly within your project settings. This includes adding email addresses that you want to use as sender identities for your emails. Make sure that you verify the domain of these email addresses to ensure successful delivery.

A screenshot of the project delivery mode settings with identities section.

To create an identity:

  • click this plus icon here. A screenshot of the project delivery mode settings with add identity button highlighted.

  • Enter the sender name and email address and select the region.

    A screenshot of the project delivery mode settings with add identity form.

    Here, if your domain is verified in multiple regions, you can select the region where you want to create this identity.

  • If you want to use this identity as the default identity, check this icon here. A screenshot of the project delivery mode settings with make default identity button highlighted.

  • When you are done with creating the identitiy, make sure to hit save! A screenshot of the project delivery mode settings with save identity button highlighted.

  • If you wish to delete an identity, you can do so by clicking the trash icon next to the identity. A screenshot of the project delivery mode settings with delete identity button highlighted.

    Important Notes

    Before deleting an identity, ensure that it is not connected to any email campaigns, transactional emails, triggered emails, or automations.

Maintaining Production Access ​

But make sure that you maintain good sending practices.

You should maintain:

  • A low bounce rate (below 2.5%).
  • A low complaint rate (below 0.05%).

Keep in mind

If your bounce or complaint rates exceed these thresholds, BlueFox Email may restrict your project, or in serious cases your whole account. Sending is blocked while a restriction is active. Now of course, we will notify you in advance when you are about to reach these limits. See Account and Project Restrictions for details.

You can always check your bounce and complaint rates here:

A screenshot of the project dashboard showing bounce and complaint rates.

Note

  • So in the project bounce rate, 100% that you see here in the screenshot is 100% of that 2.5% bounce rate limit and same for complaint rate. So if you see 50% here, that means you are at 1.25% bounce rate.
  • Similarly, In domain health section, 0/3 means you have 0 complaints out of 3 email sends and same with bounces.

Using AWS SES Directly ​

If you prefer to use AWS SES directly without any restrictions, you can do so by configuring your AWS credentials in your project settings. This allows you to send emails through your own AWS SES account, giving you full control over your sending limits and practices.

A screenshot of the project AWS settings.

This option is ideal for users who already have an established AWS SES setup and want to leverage BlueFox Email's features while using their own SES account. You can follow the steps below to set up your AWS credentials.

AWS Credentials ​

Our platform sends emails using your AWS SES, ensuring high deliverability and preventing spammers from using our platform.

Note

For AWS SES to work smoothly with bluefox.email, you’ll need at least these permissions:

ses:SendEmail, ses:SendRawEmail, ses:ListIdentities, ses:GetSendQuota

This is the minimum set needed to send emails, verify identities, and keep an eye on your send limits.

First, set up your AWS Access Key ID, Secret Access Key, Sender Identities, AWS region, and sending limit.

A screenshot of a project settings AWS credentials section.

The access key must be able to send emails via SES from the region and the sending email you set up. The sending limit should be lower or equal to the actual AWS SES sending limit. Keep in mind, that your sending limit in "sandbox" is only 1 per second!

Your AWS Credentials Are Secure

We store your credentials encrypted, so even in the very unlikely event of data leakage, attackers won't be able to use your credentials.

Use STS ( Security Token Service ) ​

STS (Security Token Service) is AWS's secure method for temporary, limited-privilege credentials. It's more secure than long-lived access keys because credentials automatically expire and don't need to be stored in your application.

Here's how to set it up:

  1. Click the Use STS button and expand the instructions banner
  2. Follow the step-by-step guide to create and configure your AWS role
  3. Copy the generated RoleArn.
  4. Paste the RoleArn into the input field here:

A screenshot of a project settings AWS credentials section.

  1. Fill up rest of the input fields and once done hit Save AWS Credentials.

Once configured, bluefox.email will use your Role ARN to securely generate temporary credentials on demand, eliminating the security risks of storing permanent access keys.

Important Notes

  • You cannot use both STS and regular AWS credentials simultaneously. If you want to switch from STS to standard AWS credentials, you must first remove your STS configuration.
  • You cannot remove AWS credentials (either STS or standard) if you have scheduled campaigns or running automations that depend on them.

Managing Sender Identities ​

In this section, you can manage the sender names and email addresses that will appear to your recipients. These identities define the sender details used for your emails. By default, emails will use the default identity. If you wish to use a specific identity for an email, you can configure it in the advanced settings of the email.

  • Adding a new identity
    To add a new identity, click the "add identity" button and provide the sender name and email address.

    A screenshot of add Identity Button

  • Default identity
    When adding identities, the first sender identity is automatically set as the default identity.

    • To change the default identity, click the "set as default identity" icon next to any other sender identity.
    • The default identity is used automatically when no specific sender identity is selected for an email.

    A screenshot of a project settings AWS credentials make identity section.

  • Deleting an identity
    If a sender identity is no longer needed, you can delete it by clicking the trash icon next to the sender identity.

    A screenshot of a project settings AWS credentials delete Identity Icon

    Bounce & Complaint Webhooks ​

    To know the bounce and complaint numbers of your emails, set up our webhooks in AWS SNS.

    To set up the hooks, expand the banner:

    A screenshot of a project settings AWS bounce and complaints section. (Not set up.)

    ... and follow the instructions. After finishing, click on Run Test button and if everything is good you should see this:

    A screenshot of a project settings AWS bounce and complaints section. (Already set up.)

    The Identity Name column displays the identities configured in your project. The green tick marks in the Bounce Hook and Complaint Hook columns indicate that the webhooks have been successfully set up for each identity. If any webhook fails to configure correctly, you can revisit the setup and re-test.

    Additionally, the red Reset Bounce Webhook and Reset Complaint Webhook buttons allow you to reset and reconfigure the webhooks if needed. This ensures that your setup remains flexible and can be updated whenever required. Once all green ticks are visible, the webhooks are fully operational, confirming that bounce and complaint events will be tracked effectively.

Frequently Asked Questions

What delivery modes are available in BlueFox Email?

Every project supports three delivery modes: Sandbox (for testing, no verified-recipient requirement, capped at 100 emails per day), Production (for sending to any address up to your approved monthly limit, requires domain verification and production access approval), and BYO SES (use your own Amazon SES account for sending, active immediately with no restrictions).

What are the limitations of Sandbox mode?

In Sandbox mode you can send to any email address, there's no verified-recipient requirement. Emails are sent from a shared no-reply address, you are limited to 100 emails per day, and throughput is capped at 1 email per second. Sandbox mode is intended for testing and development only.

How do I switch a project to Production mode?

You need to first verify your sending domain in the project delivery mode settings, then request production access. You'll be asked a few questions, including your website link, what your product or service does, your sending practices, and the monthly sending volume you need. Once approved, your project is granted a monthly sending limit matching what you requested, and the project badge updates to reflect production status. You can return to the same application page later to request a limit increase.

What bounce and complaint rate limits must I maintain in Production mode?

To maintain production access, keep your bounce rate below 2.5% and your complaint rate below 0.05%. BlueFox Email monitors these rates continuously and will notify you before you approach the thresholds. Exceeding these limits may result in project suspension.

What is the BYO SES option and who should use it?

BYO SES lets you send emails through your own Amazon SES account. BlueFox Email handles templates, contacts, automations, and sending logic while AWS handles the actual delivery. This is ideal for teams that already have an established AWS SES setup, want full control over their sending reputation, or need lower per-send costs at high volumes.

What happens to an address that bounces or complains?

The address is always added to the project's suppression list and will not be emailed again, regardless of any other settings. You can additionally choose how bounce/complaint events affect list membership: remove the contact from all subscriber lists (the default), delete the contact entirely, or do nothing. That setting only controls list membership and contact deletion, suppression always happens.